{"id":18774,"date":"2026-10-21T17:13:03","date_gmt":"2026-10-21T20:13:03","guid":{"rendered":"https:\/\/realidadsur.com.ar\/?p=18774"},"modified":"2026-10-21T17:13:06","modified_gmt":"2026-10-21T20:13:06","slug":"berazategui-pusieron-en-funcionamiento-el-primer-parque-solar-de-autopistas-buenos-aires","status":"publish","type":"post","link":"https:\/\/realidadsur.com.ar\/?p=18774","title":{"rendered":"BERAZATEGUI: PUSIERON EN FUNCIONAMIENTO EL PRIMER PARQUE SOLAR DE AUTOPISTAS BUENOS AIRES"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Se inaugur\u00f3 el primer Parque Solar de Autopistas de Buenos Aires SA (AUBASA) en Berazategui, con la presencia del ministro de Infraestructura y Servicios P\u00fablicos de la Provincia, Gabriel Katopodis.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El proyecto constituye el primer paso del Plan Integral de Sustentabilidad de la empresa, que entre sus objetivos estrat\u00e9gicos contempla promover la transici\u00f3n energ\u00e9tica mediante la incorporaci\u00f3n progresiva de fuentes renovables. En representaci\u00f3n del intendente municipal Carlos Balor, estuvieron presentes los secretarios de Servicios P\u00fablicos, Sergio Faccenda; y de Econom\u00eda, Santiago Castagno.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Este Parque cuenta con 160 paneles solares bifaciales, con una potencia instalada superior a los 99 kilovatios pico (kWp), distribuidos en dos hileras de aproximadamente 90 metros de longitud cada una. La energ\u00eda generada abastecer\u00e1 al Centro de Operaciones del Polo Hudson y a la estaci\u00f3n de peaje.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Tras recorrer las instalaciones, Katopodis afirm\u00f3: \u201cEstamos dando inicio al dispositivo de este Parque Solar con m\u00e1s energ\u00eda sustentable. Eso significa que el 50% del financiamiento de la estaci\u00f3n de peaje de Hudson se concretar\u00e1 desde aqu\u00ed y creo que ese es el camino: un Estado y una sociedad que cuiden el ambiente\u201d.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Por su parte, el presidente de AUBASA, Jos\u00e9 Arteaga, destac\u00f3: \u201cEn este contexto tan adverso que est\u00e1 viviendo la Rep\u00fablica Argentina, tenemos el desaf\u00edo de demoler la versi\u00f3n de que todo lo que tiene que ver con el Estado es malo y que la tecnolog\u00eda viene a reemplazar a los trabajadores. Esta obra tambi\u00e9n es parte del trabajo colectivo de la empresa\u201d.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Seguidamente, el gerente de Sustentabilidad de AUBASA, Sergio Federovisky, expres\u00f3: \u201cHoy, AUBASA se enorgullece de presentar y poner en funcionamiento su primer Parque Solar, el segundo de Argentina asociado a una traza de autopistas. Es un primer paso en nuestro plan de sustentabilidad y en el Plan de Adaptaci\u00f3n al cambio clim\u00e1tico\u201d.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><br>Finalmente, el ministro Gabriel Katopodis accion\u00f3 el disyuntor del tablero general, dando inicio al funcionamiento del Parque Solar.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Se inaugur\u00f3 el primer Parque Solar de Autopistas de Buenos Aires SA (AUBASA) en Berazategui,&#8230;<\/p>\n","protected":false},"author":2,"featured_media":18775,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[6,3978,4],"tags":[560,11,2476,1630,3781],"class_list":["post-18774","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-berazategui","category-politica","category-provincia","tag-aubasa","tag-berazategui","tag-carlos-balor","tag-santiago-castagno","tag-sergio-faccenda"],"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/i0.wp.com\/realidadsur.com.ar\/wp-content\/uploads\/2026\/10\/Se-puso-en-marcha-el-primer-Parque-Solar-de-AUBASA-en-Berazategui-3.jpg?fit=1920%2C1280&ssl=1","_links":{"self":[{"href":"https:\/\/realidadsur.com.ar\/index.php?rest_route=\/wp\/v2\/posts\/18774","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/realidadsur.com.ar\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/realidadsur.com.ar\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/realidadsur.com.ar\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/realidadsur.com.ar\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=18774"}],"version-history":[{"count":1,"href":"https:\/\/realidadsur.com.ar\/index.php?rest_route=\/wp\/v2\/posts\/18774\/revisions"}],"predecessor-version":[{"id":18776,"href":"https:\/\/realidadsur.com.ar\/index.php?rest_route=\/wp\/v2\/posts\/18774\/revisions\/18776"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/realidadsur.com.ar\/index.php?rest_route=\/wp\/v2\/media\/18775"}],"wp:attachment":[{"href":"https:\/\/realidadsur.com.ar\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=18774"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/realidadsur.com.ar\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=18774"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/realidadsur.com.ar\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=18774"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}